如何进行项目成本管理

With the construction of the construction industry competition becomes increasingly fierce, the owner to the building products quality of the project, the project schedule, and civilized construction requirements are constantly improve, how can we win the competition, the key point is that companies can provide high quality, low cost, short construction period of the products; And the enterprise can get great economic benefits, the key lies in its project cost control. Therefore, in the project construction process how to efficient project cost management, and has become a construction enterprise must pay much attention.
  绪论究竟如何进行项目成本管理呢?简单地说,就是通过开源和节流两条腿走路,使项目的净现金流(现金流入减去现金流出)最大化。开源是增大项目的现金流入,节流是控制项目的现金流出。在项目建设期,开源表现为扩大项目融资渠道,保证项目能够筹集足够的建设资金;节流是使融资成本或代价最低,最节省地实现项目的必要功能。在项目经营期,开源表现为增加主营业务收入、其他业务收入以及投资收益等;节流就是控制项目经营成本。论文网http://www.lwfree.com/  

  在我国,项目的成本管理一直是项目管理的弱项,“开源”和“节流”总是说得多、做得少。例如,在项目前期,由于没有深入地调研,不能准确估算完成项目活动所需的资源成本,造成开源不足的局面;或者由于项目的资金“源”自政府或股东,花起来不心疼,更谈不上节流了。甚至部分项目根本就没有预测和分析项目现金流和财务执行情况,决策失误就在所难免了。

  关键词:项目成本管理;质量成本;工期成本

  正文  一 成本控制与管理:

  1 在工程投标阶段的成本管理

  投标阶段的成本管理工作主要是通过编制施工预算为最终确定投标报价提供依据。根据施工现场的踏勘情况,技术部门提出施工技术措施;工程管理部门提出施工组织方案和设备配备规模;劳资部门提出工种结构和人员规模;结合招标文件规定的材料供应方式确定出施工中各种消耗材料价格;根据工程所在地与现驻地距离及需要调遣的人员和设备数量计算出机构调遣费用;财务部门根据项目经理部管理人员数量、交通工具及检验工具等配备情况计算出现场管理费用;最后根据招标文件规定的工期要求,按上述各方案计算出工程的总体施工费用预算,称之为施工预算。然后根据招标文件规定的税金计取比例和方式确定工程税金,再加上投标费用,预计发生的交工后保修费和后期管理费等费用构成了施工企业承揽该项工程的全部支出,称之为工程预算成本,并依此可作为投标的最低报价。预算成本的计算为企业投标提供了可靠的依据,既避免了以过低价格中标,又有利于在竞争中取胜,为企业取得合理赢利奠定了基础。

  2 在施工准备阶段的成本管理

  工程中标后,项目经理部要根据企业本部下达的预算成本编制责任预算。一是根据图纸和技术资料对施工技术措施、施工组织程序、作业组织形式、机械设备的选型、人力资源调配等进行认真分析研究,以优化施工方案,合理配置生产要素,为编制科学合理可行的责任预算创造条件。二是在对当地劳动定额、材料消耗定额、工程机械定额等进行全面调查的基础上,详细确定劳动定员、机械运行及材料供应定额。同时,经过反复比较制定出材料、机械单价控制表,结合现场施工条件计算出各分部分项工程的责任预算。三是以分部分项工程实物量为基础,按照部门、施工队和班组的分工进行分解,形成各部门、施工队和班组的责任成本,为以后的成本控制作好准备。