(1) Construction site temporary buildings Fire Design: Fire spacing is determined, and the number of design choices and placement of fire extinguishers; electrical safety design (2) Construction site temporary buildings: the distribution box design, distribution select the box configuration of electrical components as well as design, installation, grounding and lightning protection of distribution box; structural design (3) construction site temporary buildings: the structural design loads involved in selection, material selection design, foundation and foundation design, structure and structure design; (4) construction site temporary buildings construction process design: preparation before installation requirements and program design and installation of the control points, quality, project acceptance.
Construction site temporary space is a complete , organic system , it is compared with permanent buildings with strong features , so from a different angle to take a different approach to prevent and respond to a variety of security issues , the use of systems the joint action in order to achieve good control effect. To be considered in the design process the integrity of the construction site of a temporary space, and the overall effect of strengthening the linkages between systems. The principles of the various subsystems, the actual use of the method add to grasp the basic laws of the entire design and core, well meet various standards, improve the design of practicality; the majority of the construction site for the design and construction of temporary buildings provide a good reference.
The design for the object has multiple monomers, with a strong similarity, it is only for a temporary construction site where two houses were specific analysis, and other monomers may refer to its design.
Key words: prefabricated mobile house; construction safety;design of fire protection system; design of structural;design of electrical.