5 – Control box body.              12 – Control box lid.                          18 – Limit switch mounting pillars.
  6 – Solenoid valve.                  13 – External indicator.                     19 – Spring return vane actuator.
  7 – Limit switch shaft.
  Numbers in brackets refer to the exploded diagram on page 3.
  Before mounting the actuator, check that pump/reservoir orientation is correct.
  The EHD actuator can be used with its output axis oriented vertically (V) or horizontally (H) – see page
  1 for illustrations of these two options. The pump/reservoir unit (1), however, must be oriented with the
  motor (4) above the pump (1), therefore the actuator should have been ordered with the interface  
  assembled to suit the user's application. However, if necessary the pump can be rotated through 90º to
  change the orientation between (V) and (H) to suit a different axis requirement.
 
  In order to rotate the pump-to-control box interface, carry out the following steps:
1. Read through the following procedure and assemble the necessary tools, tubes, containers etc.
2. Support the whole actuator with the pump filler pointing upwards.
3. Unscrew the filler plug (3) – put both it and its sealing ring somewhere safe ready to be re-used
later.
4. Drain the oil from the reservoir (1) into a clean container about 500ml (1 pint) in capacity.
Syphoning with a U-shaped plastic tube works well here – start the flow by sucking with a
squeezy bottle. About 270ml of oil should come out. Don't lose any oil, because you need to
pour it back in again later.
5. Remove the external indicator (13) and the control box lid (12).
6. Remove the four M6 socket head screws holding the pump (1) to the control box (5).
As these screws are loosened, support the pump body and don't let it move much relative to the
control box flange, because the wires to the pump motor pass through the middle  of this
interface, and will be damaged or sheared off if much movement occurs. A small amount of oil
may drop from the interface at this point.
7. Rotate the pump relative to the control box as required – again, take care not to damage or
shear off the wires through the middle during this process. Refit the M6 screws and tighten in
place.
8. Rotate the whole actuator so that the filler hole again points upwards, and support it in this
position.
9. Pour back the oil and replace the filler plug plus the sealing ring – note that the sealing ring is
vital to keep dust and water out of the reservoir.
             ABSOLUTE CLEANLINESS OF OIL IS ESSENTIAL FOR RELIABLE PERFORMANCE.
  IF ANY EXTRA OIL IS ADDED AT ANY TIME IN THE ACTUATOR'S LIFE, USE ONLY 50cSt
  SILICONE FLUID – UNLESS PURCHASED AS A SILICONE FREE UNIT IN WHICH CASE USE
  ENERGOL OIL HLP-HM32. These fluids are available from Kinetrol.
  AFTER mounting the actuator, but BEFORE running it, pull out the vent plug (2). The vent plug is fitted
  only to prevent loss of fluid while the actuator is in transit – once the actuator is in it's fixed position, this
NOTE : During transport and storage ensure that unit pump body is orientated in the direction of intended use.    WIRING CONNECTIONS – ALL MODELS
上一篇:塑料注射成型注塑模具英文文献和中文翻译
下一篇:凸轮机构的优化设计英文文献和中文翻译

人工神经网络的电液比例...

电液系统的输出反馈非线...

煤矿液压支架的电液控制...

开关磁阻电机液压机电液...

双轴四缸电液伺服试验机英文文献和中文翻译

浅论职工思想政治工作茬...

浅谈高校行政管理人员的...

从政策角度谈黑龙江對俄...

基于Joomla平台的计算机学院网站设计与开发

AES算法GPU协处理下分组加...

酵母菌发酵生产天然香料...

压疮高危人群的标准化中...

上海居民的社会参与研究

提高教育质量,构建大學生...

STC89C52单片机NRF24L01的无线病房呼叫系统设计